Production plant for mineral oils
Production plant for mineral oils
Construction time
24 months
Order volume
9.500.000 €
Project objective
- Storage of base oils and additives (container sizes between 30,000 liters and 800,000 liters)
- 255 pumping stations
- 8000 meters of steel pipes DN 15 - DN 80
- Measurement and control technology incl. cable construction
- Visualization
- Commissioning
Special features
- Detail engineering / cost calculation
- 3D layout plan / process diagram
- Steel construction / static calculation
- Pipeline construction
- Control with Profibus
- Fully automated process technology