Production Plant for Mineral Oils
Production Plant for Mineral Oils
Construction time
24 months
Order volume
€9,500,000
Project objective
- Storage of base oils and additives (tank sizes between 30,000 liters and 800,000 liters)
- 255 pump stations
- 8,000 meters of steel piping DN 15 – DN 80
- Measurement and control technology incl. cable installation
- Visualization
- Commissioning
Special features
- Detail engineering / cost estimation
- 3D layout plan / process flow diagram
- Steel construction / structural calculation
- Piping construction design
- Control with Profibus
- Fully automatic process technology