Fuel tank farm
Fuel tank farm and supply system
for engine test benches
Construction time
22 months
Order volume
1.200.000 €
Project objective
- Fuel supply for a total of 19 test benches
- Storage capacity 160m3
- Drum supply for special fuels
- Stainless steel version for special fuels
- Standard steel design for commercially available fuels
Special features
- Construction services
- Underground double-walled tanks
- Underground double-wall pipes
- Single-walled above-ground stainless steel pipes
- Pump units with fittings
- Measurement and control technology
- Electrical control cabinet with controls and electrical installation
- Connection to building management system (BACnet)





