Adhesive mixing plant

Adhesive mixing plant Construction time 7 Months Order volume 700.000 € Project objective Piping, pumps, fittings, measurement technology Complete electrical engineering incl. Visualization Special features Mixing container with a volume of 3 m3 39 different dosing points for acrylates, resins High-melting resins and additives Planning Further references
Power plant supply

Power plant supply Construction time 10 Months Order volume 1.200.000 € Project objective Central tank farm with filling station to supply the gas engines in the power plant Media: Urea solution, lubricating oil and heating oil (filling lines caustic soda, hydrochloric acid) Complete 3D planning Piping, pump technology, fittings, measurement technology Complete electrical engineering incl. […]
Tank farm for technical liquids

Tank systemfor special fuels Construction time 16 months Order volume 2.200.000 € Project objective Brake fluid Automatic oil Engine coolant concentrate Engine coolant Windshield washer fluid concentrate Windshield washer fluid Diesel Super fuel Refrigerant R134a / R1234yf Special features First refueling system for fuels Brake fluid treatment Mixture of windshield washer fluid Dosing system for […]
Oil storage

Tank farmfor engine and hydraulic oil Construction time 19 Months Order volume 5.500.000 € Project objective Piping, pumps, fittings, measurement technology Complete electrical engineering incl. Visualization Special features Drip tray 28 storage containers a 100 m3 2 matrix distributors for 8 filling lines 17 Pigging lines Installation of the system during ongoing production Further references
Fuel tank farm

Fuel tank farm and supply systemfor engine test benches Construction time 22 months Order volume 1.200.000 € Project objective Fuel supply for a total of 19 test benches Storage capacity 160m3 Drum supply for special fuels Stainless steel version for special fuels Standard steel design for commercially available fuels Special features Construction services Underground double-walled […]